Jump to content

Baseline

Dormant
  • Posts

    10
  • Joined

  • Last visited

  • Days Won

    2

Posts posted by Baseline

  1. Greetings,

    Just a quick update that following our third maintenance downtime for heater replacements following over 4,300 hours of printing over 2 miles of filament we have begun printing the final major sections needed to complete the model.

    Hull-Forward-Sections-WIP.thumb.jpg.4efcbd1ab0d7e7cfb28dbc8ff48ff526.jpg

    She is really starting to come together now and we are really looking forward to getting her all lit up.

    Hull-Forward-Sections-WIP.thumb.jpg.4efcbd1ab0d7e7cfb28dbc8ff48ff526.jpg

    • Like 4
  2. We appreciate your kind comments and support. 

    There will indeed be post processing and a full paint job and lighting kit out. I do not know how much it weighs currently but there are 9 - 1Kg empty spools and over a dozen partially empty spools so far.

    I am most fortunate as my commander is 100% supportive of everything I do and finds this particular project fascinating.

    • Like 3
  3. Greetings,

    Indeed everything we have shown has been printed on our 2+ Extended using a 4mm nozzle and mostly default settings in Cura. Those support columns are about 1mm in diameter, we discovered the limits of printing an unsupported column using a 4mm nozzle. Although it is not apparent from the pics these columns have some quality issues and are in the process of being replaced with 1mm thin walled brass tubing.  That being said they are very close to being good enough.

    {Emperors Voice] "Everything is proceeding as I have forseen".

    • Like 1
  4. Greetings,

    Just a quick update with some progress on the project, we made a temporary stand to hold the drive section until it is ready to be married to the main hull section.

    BP-Drive-Section-Stand.thumb.jpg.7848c284f7e20dd341975e1059ed4a0b.jpg

    We have been working on ventral sections of the ship which includes the two landing bays and the reactor dome section seen here.

    BP-Reactor-Section-WIP.thumb.jpg.f98e7b4e5cb6c13e04f7ff9461054a6b.jpg

    We have also completed the iconic head section seen in the following pics.

    BP-Head-Section-left-ISO-WIP.thumb.jpg.894d40f392760ae1abf4c58bdd83d2de.jpgBP-Head-Section-right-WIP.thumb.jpg.e26f480351e2ec575943758ecff4346a.jpgBP-Head-Section-WIP.thumb.jpg.8cc5dcb7bbff936c4c8f6a64f51f5e25.jpg

    We will continue to show the progress on our project here as to the availability of the files used to create it I can not say for certain if we would release them or not.

    BP-Drive-Section-Stand.thumb.jpg.7848c284f7e20dd341975e1059ed4a0b.jpg

    BP-Reactor-Section-WIP.thumb.jpg.f98e7b4e5cb6c13e04f7ff9461054a6b.jpg

    BP-Head-Section-left-ISO-WIP.thumb.jpg.894d40f392760ae1abf4c58bdd83d2de.jpg

    BP-Head-Section-right-WIP.thumb.jpg.e26f480351e2ec575943758ecff4346a.jpg

    BP-Head-Section-WIP.thumb.jpg.8cc5dcb7bbff936c4c8f6a64f51f5e25.jpg

    • Like 4
  5. I am very pleased to be given the opportunity to publicly reveal our current project. We have been commissioned to produce a studio scale Imperial Star Destroyer to coincide with the upcoming release of Rogue One which is scheduled for release this coming December.

    Our Patrons wish to, at least for the time being, remain anonymous however they have graciously given us permission to reveal publicly our project. We wanted to wait until we reached an important milestone that was far enough along to demonstrate the size and scope of this project.

    This is a mixed media project using both our Ultimaker 2+ Extended and our X-Carve with J-Tech Photonics 3.8W laser.

    We decided at the outset to tackle perhaps the most difficult section first the drive section and so far we are very pleased with the results we are getting from our process.

    drive_section_milestone.thumb.jpg.566e7dca4c1432e6c1d50eaf72a9d627.jpgBP-Drive-Section-Structure-Side--WIP.thumb.jpg.4f240c77fb8e09a91537cafc06a071d3.jpgBP-Drive-Section-Structure-WIP.thumb.jpg.42726b23728daa370381f0a722f38b4f.jpgBP-Drive-Section-Assembly-WIP.thumb.jpg.686d1a1dbdbe3037452e1ccdc565245b.jpg

    drive_section_milestone.thumb.jpg.566e7dca4c1432e6c1d50eaf72a9d627.jpg

    BP-Drive-Section-Structure-Side--WIP.thumb.jpg.4f240c77fb8e09a91537cafc06a071d3.jpg

    BP-Drive-Section-Structure-WIP.thumb.jpg.42726b23728daa370381f0a722f38b4f.jpg

    BP-Drive-Section-Assembly-WIP.thumb.jpg.686d1a1dbdbe3037452e1ccdc565245b.jpg

    • Like 10
×
×
  • Create New...