Jump to content
stevvie

Post Processing Script to pause then move Z axis

Recommended Posts

Posted (edited) · Post Processing Script to pause then move Z axis

I can add G4 300 (wait 5minutes for the hotend to cool down)

Then G0 Z250 (move Z axis to top of printer) to my end Gcode.

I do this as it  activates a micro switch to cut power to the printer which is positioned at the top of the printer.

I was hoping somebody would help me put this into a post processing script so that i don't have to remember to edit my end gcode, As if its a script then the tool icon will appear near the send to printer after slicing, as I have such a lousy memory.

PS this need to be done when the print has finished.

Thanks

Edited by stevvie

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


  • Our picks

    • Ultimaker Cura 4.0 | Stable available!
      Ultimaker Cura 4.0 is mainly focused on the improved user interface and cloud integration.
      As always, we want to collect your user feedback for this release. If there are any improvements you can think of, feel free to mention it here and help us to shape the next release.
      • 98 replies
×
×
  • Create New...

Important Information

Welcome to the Ultimaker Community of 3D printing experts. Visit the following links to read more about our Terms of Use or our Privacy Policy. Thank you!