UltiMaker uses functional, analytical and tracking cookies. Tracking cookies enhance your experience on our website and may also collect your personal data outside of Ultimaker websites. If you agree with the use of tracking cookies, click “I agree, continue browsing”. You can withdraw your consent at any time. If you do not consent with the use of tracking cookies, click “Refuse”. You can find more information about cookies on our Privacy and Cookie Policy page.
I remember a topic (but can't find it for now) where someone mentioned good experience with an UPS by APC for his S5, which gave him bridging time of about 30 minutes.
I for myself (and my UM3) selected a quick and dirty (and a bit pricy) solution by using a power station with EPS function and 1000W power, which leads to a bridging time of at least 5 hours (calculating from the maximum power use of 200W; real consumption is about 120W). The external power brick of the UM3 is slow enough to deal with the short (30ms) switch time of the EPS.
So your first consideration would be how long you usually have to ride out a power outage, so you know your need of energy, and then select a USV or a power station.
I use a Delta2 from EcoFlow, but I know that other manufacturers also have similar power stations with EPS function available.
Regards
Link to post
Share on other sites
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Cura 5.7 is here and it brings a handy new workflow improvement when using Thingiverse and Cura together, as well as additional capabilities for Method series printers, and a powerful way of sharing print settings using new printer-agnostic project files! Read on to find out about all of these improvements and more.
S-Line Firmware 8.3.0 was released Nov. 20th on the "Latest" firmware branch.
(Sorry, was out of office when this released)
This update is for...
All UltiMaker S series
New features
Temperature status. During print preparation, the temperatures of the print cores and build plate will be shown on the display. This gives a better indication of the progress and remaining wait time. Save log files in paused state. It is now possible to save the printer's log files to USB if the currently active print job is paused. Previously, the Dump logs to USB option was only enabled if the printer was in idle state. Confirm print removal via Digital Factory. If the printer is connected to the Digital Factory, it is now possible to confirm the removal of a previous print job via the Digital Factory interface. This is useful in situations where the build plate is clear, but the operator forgot to select Confirm removal on the printer’s display. Visit this page for more information about this feature.
Recommended Posts
Enigma_M4 119
Hi,
I remember a topic (but can't find it for now) where someone mentioned good experience with an UPS by APC for his S5, which gave him bridging time of about 30 minutes.
I for myself (and my UM3) selected a quick and dirty (and a bit pricy) solution by using a power station with EPS function and 1000W power, which leads to a bridging time of at least 5 hours (calculating from the maximum power use of 200W; real consumption is about 120W). The external power brick of the UM3 is slow enough to deal with the short (30ms) switch time of the EPS.
So your first consideration would be how long you usually have to ride out a power outage, so you know your need of energy, and then select a USV or a power station.
I use a Delta2 from EcoFlow, but I know that other manufacturers also have similar power stations with EPS function available.
Regards
Link to post
Share on other sites