Posted · Heated bed kit lead time

I am now is the same boat as flux line. Again very careful and precise installation, with random failure. Identical problem. FYI sander, I submitted a ticked about it. It doesn't seem to be such an isolated case on flux lines behalf now.

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    Hi,

    I’m also in that boat, I mean literally, I’m a sailor and also ordered the heated bed at the beginning of December, now almost two months later I do not know when to expect it. Now at sea I don’t have the order nr with me. I hope it comes soon so I can install it next leave that starts February 2nd.

    Maybe there is some general news about it?

    Groet Dree

    Edit: I also don't have backorder details after updating mu store account

     

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    Hi Dre, for future references I will send your ordernumber to you in a DM.

    I have also send out a request about when it will be send. Honestly, I would have expected it to be shipped already, but maybe I am missing something.

    Will keep you posted!

     

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    Hello,

    is it realistic that Igo3d have a lead time from 3to4 weeks and all other reseller from 6to8weeks? Is the leadtime of 4to6 weeks at ultimaker directly telling the truth? Im sure i want to buy an ultimaker 1 + DIY kit. But im not sure which seller i should use. From Igo3d ive heard very bad support informations.

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    Hi Hambut,

    Are you looking for the Ultimaker Original, or just the heated bed?

    You are posting in the heated bed topic, so that may be confusing.

    But to answer your question, about the Ultimaker Original, it may be that various resellers have

    different lead times. Everyone tries to be as accurate as possible because there are no winners with purposely creating false expectations.

     

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    Thank you Sander,

    im looking for the ultimaker 1+ (the whole printer with heated bet). Sorry for confusing :)

    Then I think i will delete my order at Igo3D and will order directly at Ultimaker, because i get an answer much earlier from you than from Igo3D :)

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    The fact you can get an answer sooner, does not mean the lead time is shorter.

    perhaps it may be worth your while to give them a call.

    Obviously, in the end you should do the thing that feels best.

     

  • Link to post
    Share on other sites

    Posted · Heated bed kit lead time

    If anyone need a HBK I have one (unopen brand new) but Im on Spain.

  • Link to post
    Share on other sites

    Create an account or sign in to comment

    You need to be a member in order to leave a comment

    Create an account

    Sign up for a new account in our community. It's easy!

    Register a new account

    Sign in

    Already have an account? Sign in here.

    Sign In Now
    • Our picks

      • UltiMaker Cura 5.7 stable released
        Cura 5.7 is here and it brings a handy new workflow improvement when using Thingiverse and Cura together, as well as additional capabilities for Method series printers, and a powerful way of sharing print settings using new printer-agnostic project files! Read on to find out about all of these improvements and more. 
         
          • Like
        • 18 replies
      • S-Line Firmware 8.3.0 was released Nov. 20th on the "Latest" firmware branch.
        (Sorry, was out of office when this released)

        This update is for...
        All UltiMaker S series  
        New features
         
        Temperature status. During print preparation, the temperatures of the print cores and build plate will be shown on the display. This gives a better indication of the progress and remaining wait time. Save log files in paused state. It is now possible to save the printer's log files to USB if the currently active print job is paused. Previously, the Dump logs to USB option was only enabled if the printer was in idle state. Confirm print removal via Digital Factory. If the printer is connected to the Digital Factory, it is now possible to confirm the removal of a previous print job via the Digital Factory interface. This is useful in situations where the build plate is clear, but the operator forgot to select Confirm removal on the printer’s display. Visit this page for more information about this feature.
          • Like
        • 0 replies
    ×
    ×
    • Create New...