Jump to content

Dim3nsioneer

Ambassador
  • Posts

    4,297
  • Joined

  • Last visited

  • Days Won

    33

Posts posted by Dim3nsioneer

  1. The only thing a S5 does "on its own" with the power switch off is lowering the bed; actually gravity does that. The induced current by the z-motor could result in some flickering. For sure it does nothing else as that power switch is a mechanical switch. If it still has power, then something would be wrong with the switch.

     

    The only other, very unlikely, explanation is that it is haunted by a 👻 😉

  2. It is part of the start-up routine that the printer enables the frame light and disables it again. Finally, the printer should be ready and have the lights enabled/disabled according settings. If it goes completely off, check the power cord and if that is ok, contact your reseller if the problem persists.

  3. Cura importiert selbständig die Einstellungen der letzten bereits installierten Version. Das sollte auch über mehrere Versionen hinweg funktionieren; eine kurze Überprüfung schadet aber natürlich nie.

    Die alte Cura Version behält ihre Einstellungen und kann parallel betrieben werden.

  4. While I may have similar issues drawing a straight line with the mouse 😉 it might be a very interesting feature to be able to drag the z seam along the surface of an object starting from a certain xy coordinate on the ground plane. That line might then go up the object in different ways (along x, along y, radially from the center of the build plate, radially from the center of mass, radially from a custom xy coordinate, etc.).

  5. That log entry just means the printer found no testing version on the server. Which is correct as UM does not use testing versions anymore.

    Edit: Testing versions were actually preview versions used in the past (in most cases for the Ultimaker 3) to test new features.

  6. @Starflashbully, natürlich hoffe ich, dass Du die Material Station bald bekommst. Aber bitte sei Dir bewusst, dass "available from" und "available on" zwei verschiedene Zeitpunkte sind. Frag doch einfach Deinen Reseller nach dem Lieferdatum; er müsste in der Lage sein, Dir mind. eine grobe Zeitangabe zu machen. Vielleicht bietet er Dir auch an, die Material Station schon zu liefern wenn Du ihm erklärst, dass Du Dir des Firmware-Themas bewusst bist.

×
×
  • Create New...